For your site

What problem are you trying to solve?

Start with the problem rather than the technology. Each route below leads to the pathway that addresses it, and each one says plainly how far that pathway has actually got.

Route 1

Energy access

No reliable supply, or a diesel generator you have to keep fuelling and guarding against price movements.

Pathway 1. Jenja has not yet run at a site, and its electrical output has not yet been measured. No engine test has been completed. Read it →

Route 2

Water and cooling

Water that is not safe to drink, or produce that spoils because there is no cold chain.

Pathway 2. Jenja has not yet run at a site, and its heat output has not yet been measured. Read it →

Route 3

Fossil-fuel dependence

A fuel bill you do not control, on energy you would rather produce from what you already hold.

Pathway 3. Jenja has not yet run at a site, and its power and heat output have not yet been measured. Read it →

Route 4

Waste management

Residue that costs you money to get rid of, with the easy routes closing and a regulatory deadline on the horizon.

Pathway 4. Jenja has not yet run at a site. Read it →

Route 5

Carbon management

A climate commitment you have to report on, and a wish to hold carbon in a solid rather than release it.

Pathway 5. Jenja has not yet run at a site. Whether it leaves a carbon-rich char, and how much, has not been measured. Read it →

Have a difficult waste stream?

Four things we need to answer honestly.

We cannot tell you whether a pathway is real for you without these four. With them, we can tell you whether it is something we can support, and be straight with you if it is not.

The waste brief
  • The feedstock. What the material is, and roughly how much of it you hold per year.
  • The location. Where it is, because transport distance works against the carbon case.
  • The current treatment. What happens to it today: land spreading, landfill, incineration, or nothing organised at all.
  • The desired outcome. What you want out of it: disposal that costs less, heat, power, a route that is legally open, or a reporting obligation met.
Why the current treatment matters most

The same tonne of residue can have very different environmental implications depending on where it would otherwise go. That is why we ask for it first, and why we do not quote a saving before we know it.

If that route is already a good one, the honest answer may be that this technology does not improve it much. We would rather say that early than produce a number that does not survive review.

Measure impact at your site

Every real impact claim starts with a real baseline.

If you want a number rather than a brochure, this is what we need to produce one. These are the inputs to a site assessment, and they are the same inputs the methodology page describes.

What you hold
  • Feedstock, and the quantity per year
  • Current waste treatment, and what it costs you
  • Energy source, the fuel or supply you buy today
  • Energy demand, and the shape of it across the day
What the site tells us
  • Location, and what else is nearby
  • Operating hours, how continuous the demand is
  • Desired outcome, stated in your terms
  • Constraints, space, permits, grid connection, neighbours

What you get back. An honest read on whether a pathway is real for your site, what would have to be measured to prove it, and what we do not yet know. If the answer is that we cannot support it, we will say that rather than round the case up.

What happens next

From a brief to a measured answer.

01
You send the brief

Feedstock, location, current treatment and the outcome you want. Four lines is enough to start.

02
We name the baseline

What happens to your material today, and what your energy costs you today. No baseline means no claim, so this comes first.

03
We say what we can and cannot support

Which pathway applies, how far it has actually got, and which measurements are missing for your case specifically.

04
We measure, then we quote a number

With the site known and the outputs measured, a figure has a basis. Until then it would be a guess dressed as a result.